FW WEBB Private group, LC6000 & PLC units w/certification test.
Overview, the sequence of operation, installation scenarios, etc, start-up, set-up, run test, and basic diagnostics. There will be a test and a score of 80% is required to become Factory certified and have access to the product.
Description
The presentation will cover LC6000, MULTI-TEC, MEGA-TEC & FUSION-TEC EQUIPMENT.
Course Outline;
WHO: Telecom, OEM’s, Industrial / Mechanical Contractors, Architects, Engineers, Distributors, Reps AND Technicians
1. System Overview.
2.Model Identification (model & serial).
3.Verify Necessary Materials & Tools list.
4.Site Preparation – Clearances, Dimensions, Locations.
5.Preliminary Startup – Keeping the shelter cool.
6. PLC Controller Box/sensor Install, Detectors, Alarm wiring, and Communication Wiring.
7.Complete sequence of operation & wall-mount Run test, Test, and certification allowing product access.